Project Description:
This project was a challenging project because of the tight space between some columns, the installation of the metal lath took longer then expected because the space between columns was not the best space, same problem came with the cement application, the detail trim installation and the finish coat. Even tough the space between some columns was tight the guys did an outstanding job, this corridor makes this house look even more beautiful, it is definitely a conversation starter and a show stopper.
- Services Stucco 3 Coats, Detail trims
- DateSeptember /10 /2015
- Location Villanova, PA 19085
- Services Learn more